首页产品分类背景
How to install PVC sheet flooring ? September 10 , 2020

PVC sheet is a widely used product! And this kind of products are more common in our lives, and there are many places where PVC sheets are used to produce various different materials. PVC sheet flooring is one of them, and there are also comparisons. Many families will choose to use PVC sheet flooring to decorate our own homes?


1. In winter construction, the floor should be laid after 48-72 of self-leveling construction. If you need to fine grind and polish the self-leveling cement, it should be done after the self-leveling cement is completely dry.


2. Pour the mixed self-leveling slurry on the construction floor, it will flow by itself and level the ground. If the design thickness is ≤ mm, a special tooth scraper must be used for a little scraping.


3. If you want to enter, you must wear professional spikes, so that after entering, you can use the self-leveling deflation roller to gently roll to discharge the air mixed in, and leave immediately after the construction is completed. Do not leave for five hours, ten hours Do not use buildings inside, you can use PVC floor laying after one day.


4. The PVC sheet floor should be glued to the ground, so the new vacant room should consider the height difference between the outdoor and the indoor floor. If floor tiles are used outdoors, the indoor floor should be leveled with cement to deduct the thickness of the floor. The degree should also reach the standard.


Get A Free Quote
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

skype